Th16C-1
13:00~13:50
IGV 제어를 통한 발전용 대형 가스터빈 부분 부하 성능 개선
박새미, 김동화(두산중공업)
Doosan Heavy Industries & Construction is developing a large-capacity industrial gas turbinewhich has large capacity of 270MW in power and competitive thermal efficiency over 40% and this study is about the result of the steady state performance analysis of the gas turbine under development.Currently, combined cycle power generation in Korea is taking the peak load area as a advantage of quick start/stop of gas turbine. Therefore, it is very important to understand and improve the part load operation performance characteristics of the gas turbine.In this paper, we evaluate the part load performance based on the characteristics of the components of the gas turbine being developed and further improve the part load performance through IGV control.
Keywords : Industrial gas turbine(산업용 가스터빈), Performance(성능), Steady-state(정상 상태), IGV Control(IGV 제어)
Paper : Th16C-1.pdf

(사)대한기계학회, 서울시 강남구 테헤란로 7길 22 한국과학기술회관 신관 702호, Tel: (02)501-3646~3648, E-mail: ksme@ksme.or.kr